ATU Sligo /ATU St Angela's

go

Amazon cover image
Image from Amazon.com

The Aqua Group guide to procurement, tendering and contract administration /

Contributor(s): Hackett, Mark | Statham, Gary.
Publisher: Chichester, West Sussex, England : Wiley-Blackwell, 2016Edition: Second edition.Description: 368 p. : ill. ; 24 cm.Content type: text Media type: unmediated Carrier type: volumeISBN: 9781118346549 (paperback); 9781118346549:; 1118346548 (paperback).Subject(s): Buildings -- Specifications | Construction contracts -- Great Britain | Letting of contracts -- Great Britain | Construction industry -- ManagementDDC classification: 692
Contents:
Part I : briefing the team -- The project team -- Assessing the needs -- Buildings as assets -- Part II : available procurement methods -- Principles of procurement -- Basic concepts -- Accountability -- Value and risk management -- Fixed price and cost reimbursement -- Fixed price contracts -- Cost reimbursement contracts -- Target cost contracts -- Management and construction management contracts -- Design and build contracts -- Continuity contracts -- Partnering -- EU procurement -- Part III : preparing for and iviting tenders -- Procedure from brief to tender -- Pre-contrract cost control -- Drawings and schedules -- Specifications -- Building information modelling -- Bills of quantities -- Sub-contractors -- Obtaining tenders -- Part IV : contract administration -- Placing the contract -- Meetings -- Site duties -- Instructions -- Variations and post-contract cost control -- Interim payments -- Completion, defects and the final account -- Delays and disputes -- An introduction to sustainability in construction -- Future trends -- Index.
Summary: This authoritative guide gives a detailed account of the building team's roles and responsibilities, with best industry practice required to ensure that building projects meet clients' expectations on time, cost and quality.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Call number Copy number Status Date due Barcode Item holds
Standard Loan Standard Loan ATU Sligo Yeats Library Main Lending Collection 692 (Browse shelf(Opens below)) 1 Available 0064216
Standard Loan Standard Loan ATU Sligo Yeats Library Main Lending Collection 692 HAC (Browse shelf(Opens below)) 1 Available 0092738
Standard Loan Standard Loan ATU Sligo Yeats Library Main Lending Collection 692 HAC (Browse shelf(Opens below)) 2 Available 0092737
Standard Loan Standard Loan ATU Sligo Yeats Library Main Lending Collection 692 HAC (Browse shelf(Opens below)) 3 Available 0092740
Standard Loan Standard Loan ATU Sligo Yeats Library Main Lending Collection 692 HAC (Browse shelf(Opens below)) 4 Available 0092736
Standard Loan Standard Loan ATU Sligo Yeats Library Main Lending Collection 692 HAC (Browse shelf(Opens below)) 5 Available 0092739
Total holds: 0

Includes bibliographical references and index.

Part I : briefing the team -- The project team -- Assessing the needs -- Buildings as assets -- Part II : available procurement methods -- Principles of procurement -- Basic concepts -- Accountability -- Value and risk management -- Fixed price and cost reimbursement -- Fixed price contracts -- Cost reimbursement contracts -- Target cost contracts -- Management and construction management contracts -- Design and build contracts -- Continuity contracts -- Partnering -- EU procurement -- Part III : preparing for and iviting tenders -- Procedure from brief to tender -- Pre-contrract cost control -- Drawings and schedules -- Specifications -- Building information modelling -- Bills of quantities -- Sub-contractors -- Obtaining tenders -- Part IV : contract administration -- Placing the contract -- Meetings -- Site duties -- Instructions -- Variations and post-contract cost control -- Interim payments -- Completion, defects and the final account -- Delays and disputes -- An introduction to sustainability in construction -- Future trends -- Index.

This authoritative guide gives a detailed account of the building team's roles and responsibilities, with best industry practice required to ensure that building projects meet clients' expectations on time, cost and quality.

Share