000 | 01652cam a2200445Mc 4500 | ||
---|---|---|---|
001 | 7002754 | ||
003 | OCoLC | ||
005 | 20210921180251.0 | ||
008 | 080827s2009 enk 000 0 eng d | ||
020 | _a1405159200 (hbk.) | ||
020 |
_a9781405159203: _c£65.00 |
||
020 | _a9781405159203 (hbk.) | ||
035 | _a(OCoLC)837002754 | ||
040 |
_aGBVCP _bger _erakwb _cGBVCP |
||
082 | 0 |
_a692.8 _bDAV |
|
100 | 1 |
_aDavison, R. Peter _941425 |
|
245 | 1 | 0 | _aEvaluating contract claims / |
250 | _a2nd edition. | ||
260 |
_aOxford : _bWiley-Blackwell, _c2009. |
||
300 |
_aviii, 304 p. ; _c25 cm. |
||
336 |
_atext _2rdacontent |
||
337 |
_aunmediated _2rdamedia |
||
338 |
_avolume _2rdacarrier |
||
500 | _aIncludes index. | ||
520 | 8 | _aThis text covers the evaluation of claims for extra payments for variations and changes to medium to large construction contracts. It also shows how these claims are priced and how a valid claim is prepared. It covers both building and civil engineering contracts. | |
650 | 0 |
_aBuildings. _91079 |
|
650 | 0 |
_aConstruction contracts _zGreat Britain. |
|
650 | 0 |
_aConstruction contracts. _97798 |
|
650 | 0 |
_aConstruction contracts _zGreat Britain _xEvaluation. |
|
650 | 0 |
_aQuantity surveying. _98315 |
|
650 | 0 |
_aConstruction industry _xLaw and legislation _zGreat Britain. |
|
650 | 0 |
_aPenalties, Contractual _zGreat Britain _xEvaluation. |
|
650 | 0 |
_aPenalties, Contractual _zGreat Britain _xCosts. |
|
700 | 1 | _aMullen, John | |
902 | _a151112 | ||
907 |
_a.b1111308x _bsmmai _c- |
||
942 | _n0 | ||
948 | _hNO HOLDINGS IN LQI - 1 OTHER HOLDINGS | ||
998 |
_b0 _c140711 _dm _ea _g0 |
||
999 |
_c57579 _d57579 |