000 01105nam a2200265 a 4500
999 _c59223
_d59223
003 OSt
005 20200421171632.0
008 s2015
040 _aIE-SlIT
_c000
100 1 _aGaughan, Daire
245 1 0 _aHas cost certainty been achieved since the introduction of the new GCCC construction contracts? /
260 _c2015
300 _a p.
490 _aBachelor of Science (Hons) in Quantity Surveying, 2015
490 _aBachelor of Science (Hons) in Quantity Surveying, 2015
650 _aCost control.
_91766
650 0 0 _aConstruction contracts.
_97798
650 0 0 _aPublic works
_zIreland.
700 1 _aMcLoughlin, Leigh
856 _uhttps://dissertations-itsligo-ie.ezproxy.itsligo.ie/exam_papers/Engineering_and_Design/Quantity%20Surveying.%20Has%20Cost%20Certainty%20been%20achieved%20since%20the%20introduction%20of%20the%20new%20GCCC%20Construction%20Contracts.%20Daire%20Gaughan.pdf
_zE-version in ITS undergraduate platform
902 _a150908
907 _a.b11130210
_bsmres
_c-
942 _2ddc
_cSG_1
998 _b0
_c150908
_d-
_et
_g0