000 | 01105nam a2200265 a 4500 | ||
---|---|---|---|
999 |
_c59223 _d59223 |
||
003 | OSt | ||
005 | 20200421171632.0 | ||
008 | s2015 | ||
040 |
_aIE-SlIT _c000 |
||
100 | 1 | _aGaughan, Daire | |
245 | 1 | 0 | _aHas cost certainty been achieved since the introduction of the new GCCC construction contracts? / |
260 | _c2015 | ||
300 | _a p. | ||
490 | _aBachelor of Science (Hons) in Quantity Surveying, 2015 | ||
490 | _aBachelor of Science (Hons) in Quantity Surveying, 2015 | ||
650 |
_aCost control. _91766 |
||
650 | 0 | 0 |
_aConstruction contracts. _97798 |
650 | 0 | 0 |
_aPublic works _zIreland. |
700 | 1 | _aMcLoughlin, Leigh | |
856 |
_uhttps://dissertations-itsligo-ie.ezproxy.itsligo.ie/exam_papers/Engineering_and_Design/Quantity%20Surveying.%20Has%20Cost%20Certainty%20been%20achieved%20since%20the%20introduction%20of%20the%20new%20GCCC%20Construction%20Contracts.%20Daire%20Gaughan.pdf _zE-version in ITS undergraduate platform |
||
902 | _a150908 | ||
907 |
_a.b11130210 _bsmres _c- |
||
942 |
_2ddc _cSG_1 |
||
998 |
_b0 _c150908 _d- _et _g0 |